We recently wrapped up the installation of new light fixtures for the Terminal #1 Ticket Lobby. This work was part of MAC’s phased operation improvement program that is renovating the front of Terminal #1 as well as the baggage claim and ticket lobby spaces. We are currently involved in the following two projects that are a part of the Operational Improvement effort at Terminal #1:
- 2021 Baggage Claim/Ticket Lobby Remodel Phase 2
- 2022 Baggage Claim/Ticket Lobby Remodel